To the central content area

110 Annual Soil and Groundwater Pollution Survey and Inspection Work Plan - Hualien County

Absrtact
1.Performed on-site and burial site monitoring well sampling in the prefecture. 2.Maintain the proper rate of groundwater monitoring wells in the prefecture. 3.Organize a series of activities to promote soil and groundwater pollution prevention. 4.Petrol station inspection and counselling check operation and survey of above-ground storage tank owners. 5.Perform regular reporting of industrial areas in the county for inspection. 6. High Pollution Potential Farmland Inspection. 7.Investigation of Groundwater Contamination in Hualien Machinery Section of Taiwan Railway. 8.Investigation of soil and groundwater pollution in Taiwan Fertilizer Hualien Plant. 9.Compilation of soil and groundwater-related research reports. 10.Production of teaching aids.
Keyword
soil and groundwater
Open
top